| |
Sep 20, 2026
|
|
|
|
|
INDT 213 - Pipe Fitting Basics PROGRAM: Industrial Technology CREDIT HOURS MIN: 3 LECTURE HOURS MIN: 2 LAB HOURS MIN: 2 DATE OF LAST REVISION: Spring, 2019
Acquaints the maintenance technician with a basic foundation and pipe fitting skills necessary to make repairs or layout new pipe. Includes determination of the type and quantity of material needed to complete a task and joining those materials in the proper manner with a minimum of supervision.
MAJOR COURSE LEARNING OBJECTIVES: Upon successful completion of this course the student will be expected to:
- Use safe job operating skills. [c]
- Interpret piping and instrument tubing drawing. [f]
- Determine the necessary materials for an assigned task. [e]
- Demonstrate the basic skills required to cut and join pipe, including threading pipe, soldering and brazing. [b,e]
- Explain the use of the basic types of valves and their usage and be able to repair them. [b,e]
- Make and replace gaskets and understand their various applications. [b,e]
- Describe how sprinkler systems are constructed and expected to work. [f]
- Repair, maintain, and replace plant air distribution systems. [b,e]
- Specify the different types of pipe so that it can be purchased. [e]
- Develop basic skills to install tubing and fittings for hydraulics and pneumatics. [e]
- Demonstrate techniques for hot taping steel pipe. [e]
COURSE CONTENT: Topical areas of study include -
- PVC pipe
- CPVC pipe
- Copper pipe
- Aluminum tubing
- Black iron pipe
- Galvanized pipe
- Buttwelding PVC
- Hot tapes
- Valve bodies
- Material specifications
- Pipe threading
- Pipe joining
- Compression fittings
- Flared fittings
- Gasket materials
- Sprinkler systems
GRADING POLICY
| A |
90-100 |
| B |
80-89 |
| C |
70-79 |
| D |
60-69 |
| F |
0-59 |
Course Addendum - Syllabus (Click to expand)
|
|